Oregon LNG Terminal and Oregon Pipeline Project FERC Review – Resource Report 1, General Project Description Comments on Prefiling Review Draft 1 from FERC and Other Agencies, and Responses No. Section Page Question/Comment/Additional Information Needed Response Comments from FERC dated February 13, 2008 1 General Replace all references to “preferred” route, “preferred” site, The requested changes have been made throughout the “preferred” location, “preferred” alternative, etc. with main text, tables, and appendices in Resource Report 1. “proposed” in all resource reports. 2 General Use consistent names for the various parts of the proposed The requested changes have been made throughout the Project; preferably “Oregon Pipeline” and “Lateral” for the ppendices in Resource Report 1. pipeline components, for example. 3 General Identify the amount of land that would be required for These data have been modified or added where needed in construction and operation of all aboveground facilities. the introductory text of Section 1.4 and in Tables 1.4-1 through 1.4.4. 4 General that would be required for These areas are identified on the figures showing the construction and operation of the corrosion protection alignment sheets for the proposed routes of the Oregon system associated with the Oregon Pipeline and Lateral. Pipeline (in Appendix 1C) and the Lateral (in Appendix 1G). 5 General Update Resource Report to reflect the latest project The latest ...
Voir