BY MAIL AND FACSIMILESeptember 24, 2009Ministry of the EnvironmentDirector, Environmental Assessment and Approvals Branch2 St. Clair Avenue West, Floor 12AToronto, ON M4V 1L5CC: The Honourable John Gerretsen Minister of the Environment 135 St. Clair Avenue West, 12th Floor Toronto, ON M4V 1P5 Aaron Peters, Central Regional Project Director SkyPower Corporation 250 Yonge Street, 16th Floor Toronto, ON M5B 2L7 Peter Templin, Project Manager Jacques Whitford Stantec Limited 300-675 Cochrane Drive West Tower, Markham, ON L3R 0B8Dear Director:Re: SkyPower Corporation’s Proposed Byran Wind Project Request for Elevation to an Individual Environmental Assessment Please find enclosed Lake Ontario Waterkeeper’s comments on the above-mentioned matter. Yours truly,Mark MattsonWaterkeeper & President 600 Bay Street, Suite 410. Toronto, ON M5G 1M6T 416-861-1237 admin@waterkeeper.ca www.waterkeeper.caProud member of Waterkeeper Alliance1BACKGROUNDSkyPower Corporation has prepared an Environmental Review Report (ERR) for a proposed wind plant in Prince Edward County called the Byran Wind Project (the Project). The company plans to build up to 43 wind turbines that could each produce up to a maximum of 1.5 MW, for a combined total maximum of 64.5 MW. Prince Edward County is located on land that extends into Lake Ontario from the northeast shore, just west of Kingston and the mouth of the St. Lawrence River. The Project is ...
Voir