Project Trinity 1945-1946

icon

20

pages

icon

English

icon

Documents

2010

Écrit par

Publié par

Le téléchargement nécessite un accès à la bibliothèque YouScribe Tout savoir sur nos offres

icon

20

pages

icon

English

icon

Documents

2010

Le téléchargement nécessite un accès à la bibliothèque YouScribe Tout savoir sur nos offres

Project Gutenberg's Project Trinity 1945-1946, by Carl Maag and Steve RohrerThis eBook is for the use of anyone anywhere at no cost and with almost no restrictions whatsoever. You may copy it,give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online atwww.gutenberg.netTitle: Project Trinity 1945-1946Author: Carl Maag and Steve RohrerPosting Date: July 30, 2008 [EBook #548] Release Date: June, 1996Language: English*** START OF THIS PROJECT GUTENBERG EBOOK PROJECT TRINITY 1945-1946 ***PROJECT TRINITY1945-1946byCarl Maag and Steve RohrerUnited States Atmospheric Nuclear Weapons TestsNuclear Test Personnel ReviewPrepared by the Defense Nuclear Agency as Executive Agency for the Department of DefenseDestroy this report when it is no longer needed.Do not return to sender.PLEASE NOITIFY THE DEFENSE NUCLEAR AGENCY, ATTN: STTI, WASINGTON D.C. 20305, IF YOURADDRESS IS INCORRECT, IF YOU WISH TO BE DELETED FROM THE DISTRIBUTION LIST, OR IF THEADDRESSEE IS NO LONGER EMPLOYED BY YOUR ORGANIZATION.Since declassifiedCONTENTS:LIST OF FIGURES LIST OF ABBREVIATIONS AND ACRONYMS REPORT DOCUMENTATION PAGE FACT SHEET PREFACECHAPTERS:1 INTRODUCTION 1.1 Historical Background of Project TRINITY 1.2 The Project TRINITY Site 1.3 The ProjectTRINITY Organization 1.4 Military and Civilian Participants in Project TRINITY2 THE ACTIVITIES AT PROJECT TRINITY 2.1 Preshot Activities 2.2 Detonation and Postshot Activities 2 ...
Voir icon arrow

Publié par

Publié le

08 décembre 2010

Nombre de lectures

46

Langue

English

Project Gutenebgrs'P orejtcT niri 1ty5-944619yb ,raC aM la gatevend SrerT RohBeooih sf ro ksise uhe tyoanf  ohwyna enn ta erednw ti h ooctsa o restrialmost nstaheveooitcw sn cayy op Yr. mouaw ytia vi etig, unde ite-usor r fo smret eht reteGut ecojPre thdulcw de htisihternbLig nsceine a wtwwg.tuneebgr eBook or onlineet.n
PLEASE NOITIFY THE DEFENSE NUCLEAR AGENCY, ATTN: STTI, WASINGTON D.C. 20305, IF YOUR ADDRESS IS INCORRECT, IF YOU WISH TO BE DELETED FROM THE DISTRIBUTION LIST, OR IF THE ADDRESSEE IS NO LONGER EMPLOYED BY YOUR ORGANIZATION.
Since declassified
*** START OF THIS PROJECT GUTENBERG EBOOK PROJECT TRINITY 1945-1946 ***
Title: Project Trinity 1945-1946 Author: Carl Maag and Steve Rohrer Posting Date: July 30, 2008 [EBook #548] Release Date: June, 1996 Language: English
PROJECT TRINITY 1945-1946
by Carl Maag and Steve Rohrer
United States Atmospheric Nuclear Weapons Tests Nuclear Test Personnel Review Prepared by the Defense Nuclear Agency as Executive Agency for the Department of Defense Destroy this report when it is no longer needed. Do not return to sender.
enWhat DPAS  (GEFO NIHT CIFIOITATY CLASSSECURIR PE EFOT PY  .5 COVRIOD& PEORT T TCEJORP :)elti46195-94 1TYNIRIPERO TUN GRO.GR B 2-816-MBER: JR lanopeRDEREiF :FOERINRM  rt P6.UMBERT NNA 6R: D  .220F8 TCAG VOreteEna LANC:Ud) DEIFISSOPER .1 ALOG NUMBER:  4.T TIEL( na duStbSSCEN IO.:NO3.  CER EIPIS'TNTAC  PRO 10. ELEGRAMgrni ,iV1220ai2 EAARK ASK OR W &RP .TNEMT ,TCEJO   JRB AssociateMA ENA DDARDSE:SDrk e ivMc  anLe   s0048seW rapt-C407--90 10D AN(S):MBERT NUGRANN NOITAZINAGRO GINRMFOER P9.  73C ra laMHTROS(:)0  7. AU03-423-0TCAR RO  .8 TNOCRoe r re, agevStC.D 02 .503
LIST OF ABBREVIATIONS AND ACRONYMS The following abbreviations and acronyms are used in this volume:  AEC Atomic Energy Commission  DOD Department of Defense  LASL Los Alamos Scientific Laboratory  MAUD [Committee for the] Military Application of Uranium Detonation  MED Manhattan Engineer District  R/h roentgens per hour  UTM Universal Transverse Mercator
CHAPTERS: 1 INTRODUCTION 1.1 Historical Background of Project TRINITY 1.2 The Project TRINITY Site 1.3 The Project TRINITY Organization 1.4 Military and Civilian Participants in Project TRINITY 2 THE ACTIVITIES AT PROJECT TRINITY 2.1 Preshot Activities 2.2 Detonation and Postshot Activities 2.3 Activities after 16 July 1945 3 RADIATION PROTECTION AT PROJECT TRINITY 3.1 Organization 3.2 Site Monitoring Group 3.3 Offsite Monitoring Group 4 DOSIMETRY ANALYSIS OF PARTICIPANTS IN PROJECT TRINITY 4.1 Film Badge Records 4.2 Gamma Radiation Exposure REFERENCELIST
CONTENTS: LIST OF FIGURES LIST OF ABBREVIATIONS AND ACRONYMS REPORT DOCUMENTATION PAGE FACT SHEET PREFACE
REPORT DOCUMENTATION PAGE
LIST OF FIGURES 1-1 Location of Alamogordo Bombing Range 1-2 TRINITY Site and Major Installations 1-3 Tent Used as Guard Post at Project TRINITY 1-4 Truck Used as Guard Post at Project TRINITY 1-5 Organization of Project TRINITY 2-1 The TRINITY Shot-tower 2-2 The TRINITY Detonation, 0530 Hours, 16 July 1945 2-3 The South Shelter (Control Point) 2-4 Inside One of the Shelters 2-5 The Base Camp, Headquarters for Project TRINITY 2-5 The Base Camp, Headquarters for Project TRINITY 2-6 Project TRINITY Personnel Wearing Protective Clothing 2-7 "JUMBO" after the TRINITY Detonation
: SSREDD AND AMEfeD   rotceriD   Agelear Nucenseot,nhsni  aWcn yRSBE  : ITUNUM NQ99UKMXAtbuS ksa1. CONTR506-08 1FFCI EANLOILGNO 
ONTIOW/DRANGNGDI .a5LCEDISSAACIF: UNCLASSIFIED 1o( fhtsir pero)tTYRICUSE. SSLA CciffO    .51 :)e Confromlingtrol fidSSi(ne tffreA & ERDD YCNEMANNGRIGE AMO. TONI:S7  641O  FAPEG. NUMBER 1982 13rebmeceD 51 :ETA DRTPORE. 12 )t :81 .USPPELEMNTARY NOTES: Thi2 kcI ,0   fffidenerfrt  Romorept eh( fortcaa sbteret en Blod In71 .detiIRTSID . SONTIBUNTMETETAease; diic   relnou lnmitsirubitrtpo A):hi tRes  roflbuporpp devBUTISTRI. DID 16( foEMTNATETNOS  S/A NE:ULEDCH SEIFISSALCNU ecniedge the researcsieh sota kconlwor wwak dos ,wnednu w re mohsihtthe  in tarymilisur emorewsrveeitiburintnuf  oonde dna hoc gnititire silhtso erwtion to  in additazisnoio renagrndsath oer scevieneci  fisedsr ereve on inueCont( SDROW YEK .91 7.k ocbln  iedst esnuN  aelcgA rcyennd u Rer&EDT sowkrw sas opsnored by the Defe952H 806oF   .D0 blesar ontiNay  SoCR SM5300edB 4 U97946MK509QAXelfi Vd,Sp, ngrihT.1eD e   A6122ical Infal TechnS reivecroamitnoH.. ol Ct. Lr,ce,FASU ,eseeR .L r Agcleae NufensfOifoi nA tcneycace ths estiviti troper ebircsed,000   1sonn pernae o  ftadetsmiany cid livi, an ,lehtoblim ratiTY, which   culmniP orejtcT IRINsrif eht fo noitnatoden  iedatinci oM xeN we ,nivicer decleat nuid dongaifitna c S5.enci  in94 1auett eht  ovelaerimentsstic exp ynassraneit ddIy   fy bk nubloc  :)rebmTINIRT  os L  Y s mola AcSeitnficiL baroatory    Alamogo odrbmoB gnignaR  e an Mttha EanrictDisteer ngin nrPtaataMhn    nnsoer P  t ecoj    yrtemisoD len ExposuRadiatiolcae reWer    uNinst20g onapTes  :TCsihTBA .ARTSyr  ilat gimganiel.sonn perrp eramirew ht eesting eacy viti  o  fhte ffcestr devicee nucleailian annts. Civyrcseitn dimilatedctia d c),duonepxeemirsong cittherom oe frtancsrno yeptiram liichnec tnd atsississa htiw ,snai)L ,hwci haw stsaffed and adminiomalcS stneicifiab Latory orAS(L au(roinc nodnret totrac MED theb deretsinU ehtyy itrsveifal Cof ehthtuanu e redn,iaer w cndilivilatyra b to himTRINITY,Project A soL ehT .detcundcoe er wesisrceyextiram li .oN MED they oforitipicrtpan  itsanivitcA c llAseitnd Sry atificienilatiM4  9stea lAt. rynnosrep eseht fo thefromere el wD tenolaivisP ormbNu 1erhmact enB" yfo",oC ,napm2th Tech the 981vrci enUinac leSsilne061 nem detfiofd anas wrscebaile tsi  nhsde procaseive tectsaemseru ro cavetiua ooncif livina silivgno ffistebecame necessaoNag sfootnwht e in shedabli estuS troF dna ,orrcoSo, llweos Rl,uctaoi n .nAe avw Mexicomner, Ne441  ot nitsfo g cntsiontademechdetees, s, actorp alen,lagguec douars ntunro gndrehto dnemurtsnie detonation. Fo dezorb fero ehtinorpog s streweo ruisffm ettinoes wvititranere er dfsret ehrfmo eot nelaltiensstsop ot itcatohsthe main road, Bordaaw.yP reosnnros  tadito ins sretitcew no htiecdepnort eha dncceshe aut ted oora yletaidemmi rsteelshe thd uninotsrs  ,ht eomthe areaurveyed  nooetfarez S .onatoontithr dee  htuos ddnuorgfo, thor nan, stweacet eolt eh dots, wlter werhicht fot eheerhehs igssd ne etoh aclam notirow saa ion.A radiologicatonet dhe trefoeb lennosrep lla of ionsocathe ledtdcerodnr aea es tart edarhe tecilelc ratiop yers. Milf EngineC rospo ti ,rAymo f
FACT SHEET
Defense Nuclear Agency Public Affairs Office Washington, D C. 20305 Subject: Project TRINITY Project TRINITY, conducted by the Manhattan Engineer District (MED), was designed to test and assess the effects of a nuclear weapon. The TRINITY nuclear device was detonated on a 100-foot tower on the Alamogordo Bombing Range in south-central New Mexico at 0530 hours on 16 July 1945. The nuclear yield of the detonation was equivalent to the energy released by detonating 19 kilotons of TNT. At shot-time, the temperature was 21.8 degrees Celsius, and surface air pressure was 850 millibars. The winds were nearly calm at the surface; at 10,300 feet above mean sea level, they were from the southwest at 10 knots. The winds blew the cloud resulting from the detonation to the northeast. From 16 July 1945 through 1946, about 1,000 military and civilian personnel took part in Project TRINITY or visited the test site. The location of the test site and its major installations are shown in the accompanying figures.
uohtewtsthe  to terssheltu h dos tnaw se srstemeloki6  1tuoba ,pmaC esaB
Voir icon more
Alternate Text